
October 22, 2024
Interim President Matt Schroeder addresses vandalism on campus that may be linked to ethnic intimidation. The pedestrian foot bridge connecting the engineering campus to the main campus is projected to be finished by May 2025. The BGSU Marching Band will not be performing a halftime show during the Battle of I-75, this and more in…
1–2 minutes





Leave a comment